Good storage comes down to spacing. We set the shelves for what is going on them, so cereal boxes, small appliances and canned goods each have a shelf that fits instead of a stack that topples.
Pantry walls, walk in pantries, closets and garage cabinets all get the same build as our kitchens, with roll out trays where reaching into the back would be a chore.
What we build
- Floor to ceiling pantry walls
- Walk in pantry shelving and cabinets
- Closets with rods, drawers and shelves
- Garage cabinets
- Roll out trays and adjustable shelves
Questions people ask
Can the cabinets go all the way to the ceiling?
Yes. Going to the ceiling uses space that would otherwise sit empty, and there is no dusty gap on top.
How long does it take?
Most jobs are ready to install 4 to 6 weeks after you approve the final drawings.
Do you come out and measure?
Yes, and the consultation is free. We look at the space, measure it, talk through what you want and follow up with a written price for your actual job.
Book a free consultation