Double Door Wall Cabinet

Shown in Maple, unfinished, with the Classic Shaker door
This price includes Snow White paint. Pick a finish to see it on the cabinet.
Tap a door style or option to see this cabinet with your choices.
A two door upper with adjustable shelves. Built framed with a hardwood face frame, or frameless if you prefer, on a 3/4 inch prefinished maple plywood box. Standard size is 27 inches wide, 39 high and 12 deep, and we build it to your measurements if that doesn't fit. The price shown is painted Snow White. Pick another color, a stain or unfinished below.
Wood species
Door style
Your door
Ogee Shaker, Maple, Snow White



Screen colors are close but never exact. Order a sample door before you commit to a color.
Size
Any size, to the inch. The standard size is included in the price.
15-39 in
27-51 in
6-18 in
Construction
How the cabinet box and its front are built.
Not sure which to pick?
Frameless is the most modern and costs the least. Framed full overlay is our standard, a solid wood face frame with the doors covering almost all of it. Framed inset sets each door flush inside the frame, which takes the most hand work and gives the most traditional look.
Finish
Painted in our shop, or sanded and ready for your own finish.
Stains
the grain still shows through
Paints
a solid, even color
Screen colors are close but never exact. Order a sample door before you commit to a color.
Not sure which to pick?
Every price here is for cabinets painted in our shop, because that is how most people want them. A stain costs the same as paint, and unfinished takes the finish back off the price.
Exposed ends
How a cabinet end that shows is finished.
Not sure which to pick?
An end shows when it finishes a run. A skin matches your wood. A panel in your door style makes the end part of the cabinetry. A thick end panel stands flush with the doors for a built in look.
Notes for the shop
Optional. Drilling, a cutout, an odd wall, whatever it is.
Double Door Wall Cabinet
27 × 39 × 12 in · Maple · Ogee Shaker
No payment now. We confirm the details, then you decide.
Most jobs are ready to install 4 to 6 weeks after you approve the final drawings.